The first stage is the installation of purification boards. It is necessary to clean up the construction waste thoroughly and do a good job in garbage classification.
Specific regulatory requirements
1. The clean room is equipped with a dedicated entrance and is managed by a designated person.
2. The protective film of the purification board must not be removed. In case of special circumstances, please consult the on-site supervisor.
3. The electric tools and materials used in construction must be basically clean before entering the clean area.
4. When entering the clean area, the dust on shoes must be cleaned up thoroughly and work clothes should be kept clean and tidy.
5. Smoking is strictly prohibited in the clean area. Food and beverages must not be brought into the clean area.
6. When performing cutting and grinding operations within the designated area, a vacuum cleaner must be used throughout all cutting, grinding and drilling processes.
7. All garbage and used materials must be removed daily or as required.